Swoope Boat Ramp Project Details

  • Client: City of New Smyrna Beach
  • Design Firm: Mead & Hunt Engineers
  • Construction Duration:
    • Phase 1– 12 months
    • Phase 2– 6 months
swoope boat ramp

Swoope Boat Ramp Project Summary

Built in 2015, Phase 1 was the construction of a new boat ramp with boardwalks and floating docks; a one mile long asphalt road to enter the park; large parking lot; and restroom facilities. Built in 2019, Phase 2 was the construction of a larger parking lot and center island with floating dock in the boat ramp to help increase ramp usage among local residents.